Furnished hotel guest room ready for handover
Worldcraft Logistics Hospitality Division Ontario · Union City · Cerritos, CA Vol. 2026.01
Port of LA / Long Beach — 60 mi Lat 34.0633° N · Lon 117.6509° W

Ten months at sea. One opening date. Hospitality Furniture Logistics and Installation Services by Worldcraft Logistics

One partner from the factory floor to the guest room. We move your FF&E across the ocean, clear it, warehouse it, stage it by floor and room, deliver it on the construction schedule and install it inside the room — then haul the packaging away.

// Program at a glance

Trusted with the whole program.

Vol. 2026.01
01

70

40' containers handled in a single hospitality program

02

400

Guest rooms furnished and installed

03

3

California warehouses — Ontario, Union City, Cerritos

04

94,000SF

FDA-registered Ontario hub, 5,000 pallet positions

05

1

Project manager owning the job end to end

01 The Opening From the container to the guest room

Hotel FF&E is not ordinary freight.

A hotel opening has one date, and every crate on the water is tied to it. Casegoods arrive from several factories, in several sailings, months before the floors are ready to receive them. The furniture lands in a country that has not finished building the rooms it belongs in.

Worldcraft Logistics carries the whole chain in-house — ocean and air freight, customs clearance, drayage from the Port of Los Angeles and Long Beach, warehousing, room-by-room staging, final-mile delivery and in-room installation. You are not stitching five vendors together while the general contractor is asking where the beds are.

That is the whole argument for this page. One contract, one inventory report, one telephone number, and a delivery date somebody is willing to sign their name to.

Hospitality furniture stored on racking inside a Worldcraft Logistics warehouse
Plate I

Ontario, California. An entire property's guest-room package, racked and held by room type while the general contractor finishes the floors it is going into.

Every handoff is a place a hotel schedule can break. So we removed the handoffs.
Worldcraft Logistics — Hospitality Division
02 The Chain We Own Six steps · one accountable partner

From the sailing schedule to the made bed.

Six stages, each one run by people who report to the same project manager. Read them as a single continuous move, because that is how the schedule experiences them.

01

International Freight

  • Ocean FCL & LCL
  • Air Freight
  • Multi-Factory Consolidation

We book, consolidate and track the sailings from your furniture manufacturers in Asia and Europe. Multiple vendors, multiple POs, one arrival plan aligned to the construction schedule — not to whoever ships first.

02

Customs & Drayage

  • Customs Clearance
  • FTZ
  • Port Drayage

Clearance is handled in-house, so entry problems get solved by the same team that owns the delivery date. Containers are pulled from the Port of LA / Long Beach and are on our dock the same day — before demurrage and per-diem start eating the budget.

03

FF&E Receiving

  • Inspection
  • Quality Control
  • Damage Reporting

Every container is devanned, counted against the PO and inspected before it is put away. Concealed damage is photographed and reported the day it is found — while there is still time for the factory to replace the item, not on installation morning.

04

Staging by Floor

  • Inventory Control
  • Room-Type Kitting
  • Phased Release

Product is stored and then re-picked into room sets — king, double-queen, suite, corridor, public space. When the GC releases floors four through seven, we release floors four through seven. Nothing arrives on a floor that is not ready for it.

05

Delivery To Site

  • Blanket Wrap
  • Liftgate
  • Elevator Windows

Our own trucks run the final mile on the site's terms: night windows, protected corridors, booked service elevators, no double-handling in the driveway. Deliveries are sequenced so the install crew is never waiting on a truck.

06

Installation

  • Hospitality Furniture
  • OFCI
  • Debris Removal

Crews uncrate, assemble, place and level every piece to the designer's room layout, then strip the cardboard, foam and pallets out of the building. We hand the room over clean and photograph-ready — not full of packaging for someone else to deal with.

03 The Index What we provide

Take the whole chain, or plug us in where the project needs help.

i

International Freight for Hospitality Furniture

Ocean and air freight from your manufacturers overseas, booked and consolidated against the hotel's opening date rather than the factory's convenience.

ii

Container Drayage & Transportation

Port pickup at LA / Long Beach and domestic trucking on our own equipment, so container availability is a schedule we control, not a phone call we make.

iii

Warehousing & Storage

Secure, sprinklered, FDA-registered space across three California facilities — enough room to hold an entire property's FF&E for as long as construction needs.

iv

FF&E Receiving & Handling

Devanning, piece counts against the PO, inspection, photo documentation and damage claims filed while the factory can still remake the item.

v

Hotel Furniture Delivery

Phased, floor-by-floor delivery on the general contractor's release schedule, with blanket wrap, liftgate and booked elevator windows.

vi

In-Room Furniture Installation

Uncrate, assemble, place and level to the designer's layout — beds, casegoods, seating, lighting, mirrors, TV mounts and soft goods.

vii

Beds, Tables, Chairs, Cabinets & Sofas

Headboards, nightstands, dressers, desks, luggage benches, lounge seating, wardrobes and public-area casegoods — assembled and set in place.

viii

Packaging & Debris Removal

Cardboard, foam, banding and pallets are pulled out of the building and disposed of, so the room is turned over clean and inspection-ready.

ix

Large Hotel Project Coordination

One project manager, one inventory report, one point of contact for the owner, the purchasing agent, the designer and the general contractor.

04 Inside the Room The last hundred feet
Hotel guest room with the bed, casegoods and seating installed

The last hundred feet is where a furniture program is won.

Our installers work to the designer's room layout, one room type at a time, and leave nothing behind but the room.

  • Beds, bases & headboards
  • Nightstands & dressers
  • Desks & work chairs
  • Lounge chairs & sofas
  • Wardrobes & cabinets
  • Tables & luggage benches
  • Mirrors & wall art
  • Lighting & TV mounts
  • Public-area casegoods
  • Final placement & leveling
  • Protective film removal
  • Packaging & debris haul-off
05 The Assignment Current program
Hotel FF&E received and staged by room type in a Worldcraft Logistics warehouse

A 400-room hotel, 70 containers, one delivery date.

Worldcraft Logistics is moving roughly seventy 40-foot containers of guest-room and public-area furniture for a 400-room hotel project. The freight arrives from multiple factories across several sailings.

We clear it, dray it from the port, receive and inspect every piece into our California warehouse, hold it while construction finishes, then release it floor by floor for in-room installation. The owner gets one inventory report, one project manager and one delivery plan — instead of a freight forwarder, a warehouse, a trucker and an install crew all pointing at each other.

7040' containers
400guest rooms
1point of contact
0vendor handoffs

Project details shared with the owner's permission.

06 The Argument Why Worldcraft

Most FF&E jobs are split across four vendors. We are all four.

Which is the entire reason the schedule holds.

Freight and customs in-house

Air, ocean, customs clearance and FTZ under one roof — entry issues are solved by the team that owns your delivery date.

Warehouse capacity that fits a property

94,000 SF and 5,000 pallet positions in Ontario alone, plus Union City and Cerritos — room to absorb a construction delay without paying storage penalties elsewhere.

Our own trucks on the final mile

Domestic trucking and drayage are ours, so night windows and phased releases are scheduling decisions, not negotiations.

Installers, not subcontracted labor

The people who assemble the room answer to the same project manager who booked the ocean freight ten months earlier.

08 Q & A Questions owners ask us first

Straight answers on how a hospitality FF&E program runs.

Do you handle owner-furnished, contractor-installed (OFCI) scopes?
Yes. We routinely receive owner-purchased FF&E, hold it, and install it on the general contractor's schedule. We coordinate directly with the purchasing agent, the designer and the GC so the release schedule matches the construction schedule.
How long can you store our furniture before installation?
As long as the project needs. Construction slips; that is normal. With 94,000 SF and 5,000 pallet positions in Ontario plus Union City and Cerritos, we can hold an entire property's FF&E without forcing an early delivery you are not ready for.
Do you inspect the furniture when it arrives?
Every container is devanned and counted against the purchase order, and each piece is inspected for concealed damage. Findings are photographed and reported the same day so a replacement can be ordered while there is still time in the schedule.
Can you deliver floor by floor instead of all at once?
Yes — that is the normal way we run a hotel. Product is re-picked into room sets by room type and released in the phases the GC hands over, so nothing lands on a floor that is not ready.
Do you remove the packaging and debris?
Yes. Cardboard, foam, banding and pallets are removed from the building and disposed of as part of the installation scope. Rooms are handed over clean.
Can you handle the international freight and customs too?
Yes. Air freight, ocean freight, customs clearance, FTZ and port drayage are all in-house Worldcraft services, which is what lets us commit to a delivery date instead of a transit estimate.
Do you work outside California?
Our warehouses are in California and our port operations run through Los Angeles and Long Beach, but we deliver and install nationwide. Tell us where the property is and we will price the line-haul with the rest of the program.
How quickly can we get a quote?
Send us the room count, the FF&E package or PO list, the origin ports and your target opening date. In most cases we come back within two business days with a phased plan and pricing.
Back Cover Request a hotel project quote
Completed hotel suite handed over by Worldcraft Logistics

Tell us the room count and the opening date.

We will come back with a phased plan from the container to the guest room — in most cases within two business days.

Worldcraft Logistics — Hospitality Division (909) 632-1643 611 S Palmetto Ave, Ontario, CA 91762 Ontario · Union City · Cerritos
Get a quote